The letter

One letter a week, in your inbox.

The signal of the week, what shipped, what to try, and the editor's note. No tracking, no ads, nothing else.

We keep your address, your language and the date you joined, nothing else. Every letter has a one-click unsubscribe link that deletes the record.

← Uchi   Archive
Dezeen Architecture

Groupwork completes "world-first" high-rise held up by stone exoskeleton

September 7
Groupwork completes "world-first" high-rise held up by stone exoskeleton

A thousand tonnes of volcanic rock replace concrete and steel in Petra Heights, a housing development in north London by architecture studio Groupwork and engineer Webb Yates .

Natural materials
Read at Dezeen Architecture ↗

Related

More from Dezeen Architecture on Uchi.